Blue DC E | Smart Essential

Blue DC E | Smart Essential combines up to six IT racks with power supply, cooling, monitoring and protection systems in a compact unit. For your server room, a new location or the next step in digitalisation, aligned with your IT and the space available.

For local AI, we extend the infrastructure with models, data integration and operations: Explore Blue DC A | Smart AI.

Concept illustration: Blue DC E
Illustrative concept; equipment and dimensions depend on the selected configuration.

Compact and Powerful

Blue DC E combines a compact footprint with power supply, cooling and monitoring sized for your needs. We align the configuration and capacity with your IT, installation space and availability requirements. Options for high-performance computing (HPC) and smaller installations are also possible.

Achievable PUE depends in particular on utilisation, cooling design, environmental conditions and measurement boundaries. Targets and evidence are therefore defined for each project.

For certification against DIN EN 50600, the specific assessment subject, configuration and scope are agreed. A Blue Angel award requires fulfilment of the applicable award criteria within the relevant procedure. Warranty coverage and duration, up to five years, are defined in the offer.

Climate-neutral data centres: boundaries and evidence

A low PUE alone does not demonstrate climate neutrality. Assessing a climate-neutral data centre requires a transparent greenhouse gas inventory with a defined reporting period and boundaries. Electricity procurement, refrigerants and the lifecycle stages included must be stated, alongside documented emission avoidance and reduction measures. Blue DC E does not itself establish that a facility or its operation is climate-neutral. For Blue DC E, we assess IT load, the installation room, cooling and potential heat users.

Explore data centre planning →
BLUE DC · INFRASTRUCTURE

Technology working together.

Data Center Monitoring & Management

Analysis, monitoring and evaluation of alarm and energy data, monitoring of the environmental conditions in the micro data center and the surrounding area (room monitoring) with sensors for temperature, access, error messages and much more.

Electronic Access

Secure electronic access control (RFID) with logging and video function, biometrics and LAN interface for modular expansion.

Integrated cooling

Cooling sized to your requirements, using an inverter-controlled direct-expansion system or the Blue DC cooling system. The design considers IT load, location and opportunities for heat reuse.

Concept illustration: Blue DC E
Illustrative concept; equipment and dimensions depend on the selected configuration.

Video Surveillance

Video surveillance with configurable recording. Unauthorised access can be traced and documented.

Highly Available Power Supply

Integrated redundant electrical sub-distribution according to EN 61439, UPS and emergency power supply according to ISO 22237, compact active redundant rack PDUs including energy management, evaluation function and monitoring.

Active Fire Protection Systems

Early fire detection and a project-specific suppression or fire-prevention concept. Component selection, approvals and evidence are defined for the specific design.

Concept illustration: Blue DC E
Illustrative concept; equipment and dimensions depend on the selected configuration.

Data Center Monitoring & Management

Analysis, monitoring and evaluation of alarm and energy data, monitoring of the environmental conditions in the micro data center and the surrounding area (room monitoring) with sensors for temperature, access, error messages and much more.

Electronic Access

Secure electronic access control (RFID) with logging and video function, biometrics and LAN interface for modular expansion.

Integrated cooling

Cooling sized to your requirements, using an inverter-controlled direct-expansion system or the Blue DC cooling system. The design considers IT load, location and opportunities for heat reuse.

Video Surveillance

Video surveillance with configurable recording. Unauthorised access can be traced and documented.

Highly Available Power Supply

Integrated redundant electrical sub-distribution according to EN 61439, UPS and emergency power supply according to ISO 22237, compact active redundant rack PDUs including energy management, evaluation function and monitoring.

Active Fire Protection Systems

Early fire detection and a project-specific suppression or fire-prevention concept. Component selection, approvals and evidence are defined for the specific design.

Configurations

BLUE DC E

Bronze

BLUE DC E

Silver

BLUE DC E

Gold

BLUE DC E

Platinum

Dimensions

Blue DC E Bronze/Silver: width 800 mm, height 2300 mm, depth 1250 mm.

Blue DC E Gold: width 1020 mm, height 2350 mm, depth 1180 mm.

Blue DC E Platinum: width 1350 mm, height 2350 mm, depth 1180 mm.

Blue DC E Blue DC A Blue DC M Blue DC X
Product illustration
KI-generierte Konzeptdarstellung: Blue DC E
KI-generierte Konzeptdarstellung: Blue DC A
KI-generierte Konzeptdarstellung: Blue DC M
KI-generierte Konzeptdarstellung: Blue DC X
Product ID
BDCE1.47 – 6.282
BDCA1.47 – 6.282
BDCM2.94 – 24.1128
BDCX24.1128 – 124.5828
RZ Class
Edge Data Center / Micro Data Center
AI data centre / Micro data centre
Module / Container Data Center
Data Center building
IT racks
1–6
1–6
2–24
24–124
Rack units (47 U per rack)
47–282
47–282
94–1.128
1.128–5.828
Connected load
6 kW – 70 kW
up to 900 kW¹
6 kW – 212 kW
20 kW – 60 MW
PUE design target²
< 1,13
≤ 1,20
< 1,10
≤ 1,05
Availability class under DIN EN 50600
1–4
1–4
1–4
1–4
Protection classes under DIN EN 50600
1–4
1–4
1–4
1–4
Granularity level under DIN EN 50600
1–3
1–3
1–3
1–3
Emissions measurement and accounting
Load- and temperature-controlled cooling
Use of Waste Heat
DIN EN 50600 – certification support
ISO/IEC 27001 – ISMS support
KRITIS / NIS2 – project support
Blue Angel – certification support
Availability concept
Security concept
Redundancy concept
High Performance Computing (HPC) Capable
AI Optimization
Design and origin
Cooling concept
Professional Electrical Engineering
High-Availability Power Supply
Energy storage concept
Extensive Security Technology
Electromagnetic compatibility concept
Intrusion protection concept
Modern Access Control
Fire protection concept
Integration of renewable energy
Dynamic monitoring
Proactive Maintenance
Specialist Planning in Accordance with HOAI
24×7 Monitoring
24×7 User Helpdesk
Premium Support with SLA Recovery
Warranty and maintenanceWarranty up to 5 yearsScope as offered. Maintenance and service can continue beyond this period under the agreed contract.Warranty up to 5 yearsScope as offered. Maintenance and service can continue beyond this period under the agreed contract.Warranty up to 5 yearsScope as offered. Maintenance and service can continue beyond this period under the agreed contract.Warranty up to 5 yearsScope as offered. Maintenance and service can continue beyond this period under the agreed contract.

Compare configuration options. The classes and levels are selectable configuration options: availability 1–4, protection classes 1–4 and measurement granularity 1–3. The chosen availability class requires consistent power, cooling and cabling design; protection classes are assigned to the relevant security zones. Selection is based on the risk assessment and agreed scope of supply. An availability class does not specify a fixed uptime percentage.

Check marks indicate available services and functions that can be integrated. Certification support covers planning and evidence preparation; certification is awarded by the competent independent body. Emissions measurement and accounting provide assessment data, not a blanket promise of CO₂ savings.

Product codes: BDC + model + number of racks.rack units. Example BDCA1.47: Blue DC A with one rack and 47 U. The listed series use 47 U per rack; 24 racks provide 1,128 U and 124 racks 5,828 U.

¹ Blue DC A: 1–6 racks with 30–120 kW of IT power per rack. The sizing example 6 × 120 kW × 1.25 gives a total supply requirement of 900 kW. The factor 1.25 is a sizing assumption, not a measured PUE value. Cooling, grid connection, reserves and redundancy require technical verification before implementation. Sizing and cooling design →

² PUE values are design targets. Actual performance depends on factors including utilisation, climate, cooling technology and measurement boundaries, and is determined during operation. The stated power and rack ranges do not guarantee that every maximum can be achieved simultaneously in a single configuration.

Blue DC A: functions and design in detail
Use of Waste Heat
Allow for heat extraction
Availability concept
Redundancy for critical functions
Security concept
Zones and controlled access
Redundancy concept
Multiple paths and component redundancy for the selected class
High Performance Computing (HPC) Capable
GPU clusters and high-speed networking
AI Optimization
Local models and knowledge integration
Design and origin
Designed by High Knowledge
Cooling concept
Direct-to-chip plus residual air cooling
Professional Electrical Engineering
Power distribution for GPU loads
High-Availability Power Supply
Plan UPS and backup power
Energy storage concept
Size the backup duration
Extensive Security Technology
Monitor access, fire and leaks
Electromagnetic compatibility concept
EMC-compliant installation
Intrusion protection concept
Protect the enclosure and access points
Modern Access Control
Role-based access rights
Fire protection concept
Fire compartments and early detection
Integration of renewable energy
Integration into the energy concept
Dynamic monitoring
Monitor IT, power and cooling
Proactive Maintenance
Maintenance and update plan
Specialist Planning in Accordance with HOAI
Multidisciplinary design
24x7 Monitoring
Continuous monitoring as an operational option
24x7 User Helpdesk
Helpdesk as a service option
Premium Support with SLA Recovery
Defined response and recovery targets